- analyzing of estimates provided by the contractor: checking types and volumes of work, checking the list and amount of materials, detailed analysis and calculation of the unit cost by type of work, checking of the works and materials that are not included;
- the technical construction supervision of the technology and quality performance of all construction works and their compliance with the approved design and estimate documentation. Compliance of building codes, rules and technical conditions;
- monitoring of compliance with the approved schedule of construction and installation work, delivery terms of materials and equipment;
- examination together with design company of general contractor's proposals to improve quality, lower costs and improve of the works;
- checking of quality certificates, results of laboratory analyzes and materials testing for components and structures used in the construction of the facility;
- checking and signing of survey reports of execution of hidden works;
- monitoring the timeliness and accuracy of completion of the technical construction documents;
- monitoring of introduced changes in the execution project that appeared in construction process;
- monitoring timely implementation of all requirements and guidance of the author and the State Construction Inspectorate.